LDM C.V. is developing the project ‘Warmteleidiing Vlaardingen – The Hague’ with a route of approximately 23.5 km consisting of a DN700/900 Heat Pipeline.
This project is divided into five lots (A to E), of which Tjaden will carry out drainage for lots A to D.
The drainage consists of phreatic drainage, open drainage and stress drainage in the intermediate sand layers.
The route includes several closed front boreholes where the pressing and receiving pits will be provided with drainage.
The drainage activities will be carried out in accordance with BRL 12000, protocols 20, 30 and 40 (drainage).